Case study

MOPU Transport & Installation (K5 Malaysia)

MOPU Transport & Installation (K5 Malaysia)

Sealand is participating in a design competition for an integrated jack-up MOPU platform with processing facilities including a conductor/riser support structure.

The MOPU will be located offshore Sarawak, Malaysia, for testing at K5 field for 5 years.

After 5 years of testing, the MOPU will be relocated to another location or remain at K5 field.

The project is on-going, and Sealand is working with Petronas to find the best design concept using its multi-skilled engineers.

The Offshore Campaign is estimated to be undertaken in 2020 in three phases:

  • Campaign 1 – Conductor Support Structure Installation;
  • Campaign 2 – Wellhead Module Installation on the CSS;
  • Campaign 3 – MOPU Tow & Installation.

Covering

  • FEED Study
  • Concept Engineering
  • Project Engineering
  • Analysis Support
  • Structural Support
  • Installation Support
  • QA/QC Advisor
  • Draughting Support